• Skip to main content
  • Skip to footer
  • E-mail
  • LinkedIn
  • Phone
  • YouTube

Harvey Planning Consultancy

  • Services
    • Pre-Construction Planning Management
    • Project Controls During the Construction Phase
    • Forensic Schedule Delay Analysis
    • Other Industries
    • Technologies
  • About
    • What We Do
    • How Does It Work?
    • Consultants
    • Client Focus
    • Operations
    • Projects
  • Library
    • Planning & Scheduling
      • Chronicle of Planning
      • History of Critical Path Method
      • Precedent Networks
      • Planning Terminology
      • Planning Hierarchy
      • Strategic and Tactical Planning
    • Work Study Introduction
    • Productivity & Production Rates
    • Earned Value Analysis
    • Forensic Schedule Delay Analysis
      • Summary of Procedures for building a claim
      • Scott Schedule
      • Construction Delay Terminology
    • Procurement Routes for the Construction Industry
    • Documentation
      • Forms of Contract
    • Quotations
  • Contact
  • Blogs
    • Studying the Past to Reveal the Future
    • The History of Banking and What the Future Holds
    • Civil Engineering
    • Architects
  • Book

Technologies

Digital Solutions

http://proctal.com/

Drone Photogrammetry

Photogrammetry

Collecting physical information from 2D photos to generate photorealistic 3D representations of topographic surfaces

DSM & DTM

Digital surface model (DSM) = Earth’s surface including objects on it.

Digital terrain model (DTM) = Earth’s surface without any object.

Progress monitoring

Photos and videos taken periodically to track progress

Point cloud & 3D modelling


Densified 3D point cloud and 3D textured mesh to be used for:

  • 3D Model for visual presentations and fly through.
  • BIM model integration (the ability to measure between the scanned and the design
    model)
  • Volumetric and linear measurements.
  • Profile creation (Elevation

Thermal Imaging & Inspection

Infrared thermography (IRT ), thermal imaging and thermal video cameras detect radiation and heat leaks in faulty thermal insulation.

BIM Model Integration

From Tender to Close out:

  • Major Discrepancies Identification
  • BOQ Analysis and Validation
  • Cost Estimating
  • 4D Schedule Simulation
  • 5D ( BOQ /Cost) Simulation

Visualisation & VR/AR

  • 3D animation
  • Virtual Reality (VR)
  • Augmentation Reality (AR)
  • IoT

“Helping you to make your plan work”

Footer

Based in Ireland

Tel:

Email: [email protected]

  • E-mail
  • LinkedIn
  • Phone

Harvey Planning Consultancy Ltd

Registered in England Company
No. 13217849



Terms and Conditions

Copyright © 2024 ·Harvey Planning Consultancy Ltd · Site by Maloney IT · Customer Portal

Scroll Up